COMPLEX OF COURT HOUSES TYPE “STUDIO” “LILIA”
SUNNY BEACH RESORT COMPLEX
BULGARIA
The residential building is designed as an apartment for seasonal use / if possible all year round /. The living area is compactly divided into one-bedroom studio apartments. The apartments are economically designed, in accordance with their purpose – sleeping area, living room with kitchenette and dining area, hallway with wardrobe and bathroom with tub. If necessary, the living room corner will be adjusted as an additional place for a bed / in 2 + 2 configuration /. Given the maritime nature of the homes, the terraces are extensive and when opened become a natural extension of the living room.
The building without a basement consists of 5 floors, the last of which is partially sloping.
The access to the apartments will be through a controlled entrance with a secured security room, stairs and an elevator.
The construction of the building is monolithic – reinforced concrete, skeletal-beamless structural system. The walls are made of ceramic bricks, protected from the outside with the necessary thermal insulation – according to the standard. The interior walls will be treated with non-wet technological materials. The facade will be decorated with mineral moisture-resistant plasters, stone cladding, metal and more. according to the architectural detail. The windows will be made of PVC with a thermal bridge, which will contribute to the overall comfort of the building.
The necessary communication, information and security installations are provided; satellite TV and internet installations, as well as an air conditioning system installation.
Situation plan
The yard will be as green as possible. It is planned to use the entire infrastructure of the hotel complex “KOKICHE” – outdoor pool combined with children’s pool, restaurant, open day bar with natural access to the pool and the building, exchange office, hairdresser, shops, etc.
The entrance is through the main entrance from the southern part of the street along the eastern facade. In front of the main entrance of the complex there is a parking lot.
Departure is possible through the nearby hotel complex “Kokiche” and from there through the common area with the hotel to the street on the east side.
Technical indicators | |
Plot area | 575 m 2 |
Built-up area | 176.25 m 2 |
Unfolded built-up area | 869.91 m 2 |
STUDIO apartments | 18 |
2-room apartments | 3 |
Shop | 1 |
Building density | 30% |
K int | 1.5 |
The complex of resort dwellings of the “STUDIO” type, “LILIA” type, is located in the “West” zone of the “Sunny Beach” resort. They are located on LPR XI – 239 in block 5001 of the construction and zoning plan of the resort. on a total area of 575 sq. m.
The area is characterized by the following important features:
• Near the central part of the resort, the complex “LILY” is located practically within walking distance of all important visitors to the resort, namely:
Object | Approx. in meters |
the beach strip of the complex | 500 |
the central pedestrian alley | 250 |
central bus stop, taxi station, tourist bus stop | 250 |
polyclinic | 250 |
24-hour pharmacy | 100 |
police | 300 |
300 | |
central market for goods and food | 100 |
bank offices | 100 – 200 |
exchange offices | 100 |
tourist offices | 100 – 200 |
the most attractive restaurants and bars in terms of price category | 100 – 300 |
the most popular disco and nightclubs in the complex | 300-400 |
water park “Action” | 300 |
Exit completion of living space
Flooring
- Sleeping area, living room, kitchenette, corridors – laminate / ceramic
- baths: terracotta
- terraces: ceramic
Walls
- rooms: living room, kitchen, plasterboard corridors with latex
- baths: faience
- Thermal insulation of external walls
Sanitary:
- fully equipped with sanitary ware, bathroom, accessories
Window frames:
- PVC
Water and Plumbing installation
- faucet: polypropylene
- sewerage: PVC
- individual water meter in each home
Electronic installations
- Electrical cables according to the standard in corrugated pipes
- Email contacts, lighting switches
- Lighting fixtures for common areas and the environment
- Individual electricity meter for each apartment
- Individual electric water heater in each apartment
Doors
- MDF
Kitchen box
- Sink with faucet, kitchen cabinets with the necessary outlets – electric and shout
Cabling for cable TV, internet
Air conditioner “split” – 1 pc. for each apartment
Telephone wiring
Electronic kitchen appliances
- Microwave
- email tiles / plain /
ceramics / extra charge /
- refrigerator 80l.
- hood
Fully furnished sleeping area
All-day room equipment
Curtains
TV – 14 ”/ 21” and above – for extra charge /
Cooking set, bed linen, other accessories
Ensure I cut an extra cloak
Services …
ANNUAL MAINTENANCE AND MAINTENANCE FEE: 10 EURO / sq.m of the total built-up area of the apartment
When signing the contract, the owners in the resort complex of the “studio” LILIA “the opportunity to use the following services:
- 24/7 security
- daily cleaning of common areas and surroundings
- support for adjacent green areas
- free use of the pool
- water and electricity consumption for common areas
- technical support for – elevator, lighting, etc.
- Full access for use of ALL SERVICES PROVIDED ON THE TERRITORY OF THE ADJACENT HOTEL COMPLEXES “JASMINE” and “KOKICHE”
The following services are available at an additional cost:
- cleaning and airing the apartment
- washing and ironing
- ongoing repairs and maintenance for each home
- assistance in paying taxes due by the owner on site: building, garbage, as well as all necessary household expenses – electricity, water, telephone, etc.
Stages | |
Stage 1 | 26.09.2007 First sod |
Stage 2 | 06.10.2007 Excavation. Terracing the terrain. Work on casting ‘Elevation 0’ and first slab. |
Stage 3 | 15.10.2007 Construction of the rough construction on floor 1. |
Step 4 | 22.10.2007 Construction of the rough construction on floor 2. |
Step 5 | 30.11.2007 Construction of the rough construction on floors 3-5. Signing of an act for acceptance of the construction of the building up to the stage of “rough construction” (Act Model 14). |
Step 6 | 10.01.2008 Start all finishing work. |
Stage 7 | 10.01.2008 Completion of all finishing works. Final completion of the building. Signing of Act Form 15. |
Stage 8 | 10.01.2008 Handing over the finished homes to the owners. Issuance of a Certificate for commissioning of the site (Act Model 16). |