The new holiday type complex “MAGNOLIA RESIDENCE-3” is located in a prestigious place, not far from the beach and close to the center of the resort complex “Sunny Beach”.
The special advantages of the building are its central location, proximity to all amenities and entertainment offered by the resort – bars, restaurants and nightclubs, shops, pharmacies and bus stops.
The site “Magnolia Residence-3” is characterized by functional planning and fresh trends in the exterior design of the building, which give the building a modern and attractive look.
The complex is located in the “West” zone of the tourist complex “Sunny Beach”. It is located on a regulated plot of land XV-357 in block 3903 of the development and zoning plan of the resort, on a total area of 870 m 2 < / sup>.
The building is designed for seasonal use, but it is possible to use all year round. The living area is mostly compact as one-bedroom studio apartments. The apartments are economically designed, in accordance with their purpose – sleeping area, living room with kitchenette and dining area, entrance hall with wardrobe and bathroom with tub. Corner as extra bed space / in configuration 2 + 2 /.
In order to expand the range of apartments in this building are designed 12 one-bedroom apartments with maximum compact distribution of rooms. Each apartment consists of 1 bedroom, living room with kitchenette, entrance, bathroom with tub.
In view of the maritime nature of the apartments, the terraces of the apartments are large and when you open the door are a natural extension of the living room.
The architectural graphics of the building are simple and free of unnecessary details. The fresh color of the building gives the project a modern and contemporary look.
The building consists of 4 floors, without a ground floor.
The access to the apartments will be through a controlled entrance with a separate security room, a small reception / lobby / – through a staircase and an elevator located in the central part of the building.
The construction of the building is monolithic – reinforced concrete, skeletal-illogical structural system.
The walls are made of ceramic bricks, protected from the outside with the necessary thermal insulation – according to the standard. The interior walls will be finished with materials without wet processes. The facade will be decorated with mineral moisture-resistant plasters, stone cladding, metal, etc. will be made of PVC with a thermal bridge, which will contribute to the comfort of the building.
Necessary communication and security installations are provided, installations for cable TV and internet, as well as installation of air conditioning system.
The yard will be as green as possible. Access to it will be through a controlled entrance, which is a natural continuation of the main entrance of the building. There is also an outdoor pool combined with a children’s pool.
- Lack of heavy traffic. The complex is located on a quiet street, despite being in the ideal geometric center of the resort / north-south /.
- Elite appearance of the area, nearby are popular hotel complexes of apartments “HRIZANTEMA”, “TRAKIA”, “BOHEMI”, “DREAMVILLE”, “ROYAL SUN”.
- Convenient and fast access to major roads:
- Nessebar – Sunny Beach
- Burgas – Varna
- Lack of paid access for cars, as in the “east” zone.
- In the immediate vicinity of the central part of the resort “MAGNOLIA RESIDENCE-3” is located practically within walking distance of all important resorts in the complex, namely:
Object | Approx. in meters |
The beach of the resort | 300 |
Central pedestrian alley | 200 |
Center. bus stop, taxi, mini train stop | 100 |
Polyclinic | 150 |
24-hour pharmacy | 50 |
Police | 350 |
300 | |
Center. market for goods and food | 50 |
Bank offices | 100-200 |
Exchange offices | 50 |
Travel agency offices | 50 |
Probably the most attractive restaurants and bars in terms of price | 100-300 |
The most popular discos and nightclubs in the resort | 300 |
“Action” water park | 400 |
Main stage of completion of the living space
Flooring
- Living room / bedroom, corridor – laminate / ceramic tiles /
- Bathrooms: ceramic tiles
- Terraces: ceramic tiles
- Common parts: ceramic tiles
Walls
Living room / bedroom, corridor – machine putty, painted with latex
- Baths: faience
- Exterior walls: thermal insulation, mineral plaster
- Common parts: latex painted machine putty
Sanitary facilities
- fully equipped with sanitary ware, bath (shower), accessories
Window Frames
- PVC
Plumbing installation
- Plumbing: polypropylene
- Sewerage: PVC
- Individual water meter for each apartment
email installations
- Standard electrical cables
- email contacts, light switches
Lighting fixtures for apartments and common areas of the building and the surrounding area
- Individual electricity meter for each apartment
- Individual electric water heater in each apartment
Doors
- Entrance, interior doors: MDF
- Bath: PVC
Kitchen box
Sink, faucet, stove, hood, kitchen cabinets – upper and lower and countertop
- Kitchen appliances – for a fee
- Aspirator
- Refrigerator
In addition
Installation of cabling for cable TV, Internet Installation of split type air conditioner – 1 pc.
For each apartment Installation of a second air conditioner – extra charge
- Fully furnished sleeping area – for a fee
- Fully furnished living room – extra charge
- Curtains / blinds – extra
- TV – for a fee
Set of dishes, bed linen and other accessories – extra charge
Services
ANNUAL MAINTENANCE – FOR MAINTENANCE AND MAINTENANCE: 10 EURO / sq.m without VAT on the area of the apartment, together with the common areas.
With a signed contract for maintenance and protection of property, the owners of Exclusive Holiday Apartments “MAGNOLIA 3 RESIDENCE” are provided
opportunity to use the following services:
- round-the-clock and year-round security
- daily cleaning of common areas and surroundings
- maintenance of neighboring green areas
- free use of pool, sunbeds, umbrellas
- Water and electricity consumption for common areas
- technical maintenance of the facility – elevator, lighting, etc.
The following services are available at an additional cost:
- cleaning and airing the apartment
- repair and maintenance for every home
Assistance in paying the obligations of the owner – taxes, utility bills – electricity, water, telephone, etc.
- airport transfers – group and individual
Stages | |
Stage 1 | 31 October 2013 First earthworks |
Stage 2 | 1 October 2013 – 05 November 2013 Earthworks Site distribution Works on laying zero level and first slab. |
Stage 3 | 11/06/2013 – 11/16/2013 Rough construction on level 1 |
Step 4 | 17/11/2013 – 27/11/2013 Rough construction on level 2 |
Step 5 | 28/11/2013 – 08/12/2013 at level 1.19 S.2 |
Step 6 | 10.10 2013 Rough construction on level 4 |
Stage 7 | 20/12/2013 – 20/01/2014 Rough construction at level 5 Construction of all partition walls, roof construction, installation of all installations, joinery, insulation, external plaster Signing of an act for acceptance of a building structure before the stage of “rough construction” / Act form 14 / |
Stage 8 | 01/15/2014 – 01/25/2014 Roof constructions Finishing works. |
Step 9 | no later than 10.05. 2014 Completion of all finishing works. Final completion of the building. Signing an act Form 15. |
Step 10 | 11/05/2014 – 30/05/2014 Final completion of the vertical distribution of the building. |
Step 11 | 06/10/2014 Transfer of ready dwellings to the owners Organizational measures for preparation of the commissioning of the site for the summer tourist season. |